Built by a manufacturer. For manufacturers.

One platform. One bill.
The whole plant.

Secure program control, live monitoring of every machine and operator, scheduling, and secure AI governance on one on-premises server, with one Pulse Point device per machine. Built and proven on a working floor of 40-plus CNC machines.

CMMC PHASE 2 AUDITS: SUSPENDED JULY 2026 ยท SELF-ASSESSMENT + NIST 800-171: UNCHANGED
THE CLOCK MOVED. THE STANDARD DIDN'T.
FLOOR TELEMETRY  ·  CELL 3 SIMULATED
Utilization
0.0%
Spindle load
0.0%
Parts today
0
Platform journal · events + grades
Built for shops operating under ITAR CMMC 2.0 AS9100 NADCAP FDA 21 CFR 820 ISO 13485 IATF 16949 API Q1 NIST SP 800-171 DFARS 252.204-7012 ISO 9001
0+
CNC & Swiss machines on the proving floor
0
Years of precision manufacturing behind the proving floor
0
Day Proving Period for Pulse IQ · observe-only · a validation report you own
0
Outbound connections required · ever
THE PROBLEMPRODUCTION PULSE · REV E

Every precision floor produces the data. Almost none can prove it.

Two expectations are converging on the same shop: margins that want visibility and customers who want evidence. Most shops answer them with three or four disconnected tools, each with its own device, contract and renewal date, designed to move files and count parts, not to show what every machine is doing right now or to prove exactly what happened last Tuesday. That gap shows up in quotes, in audits, and in the morning meeting.

Programs walk to the machine on a USB stick

Your CNC programs are intellectual property. On defense work, they can be controlled unclassified information. Most shops still move them on jump drives and shared folders, or leave them on the machine control, with no record of who took what, where, or when.

You need Program Pulse →

Visibility ends at the office door

Spindles sit idle while the schedule lives in a spreadsheet and status lives in someone's head. And when a vendor bolts on "AI alerts," they arrive with no published accuracy and no authority model: noise, not signal.

You need Shop Pulse + Pulse IQ →

Audit prep is archaeology

When the auditor asks who approved revision C and when it reached the machine, the answer is a week of digging through emails, folders, and memory. Evidence should be a byproduct of running the shop, not a project, whether the audit comes from a registrar, a prime, or your largest customer.

You need The revision ledger →
THE PLATFORMONE SERVER · ONE DEVICE PER MACHINE · ONE SUBSCRIPTION

Five modules, one server, one device per machine.

Every module can be bought alone or in any combination, and all of them run on the Production Pulse Server with a Pulse Point at each machine. Start where it hurts most, then expand: everything shares the same machines, parts, jobs, users and record, so each module you add makes the others smarter.

The first month of every installation. Proven, not promised.

The 30-day Proving Period. Observe-only, graded in the open.

Book a demo →

The modules you install work from day one: program control, monitoring, scheduling, the record. Pulse IQ spends its first 30 days on your floor in observe mode. Scope, software version, baseline and evaluation criteria are fixed before it starts; every forecast is published before the period it covers and graded when the period closes; and at day 30 you receive a validation report you own. Only that graded record, reviewed with you, supports promotion from observe to recommend, and any step toward action takes your written authorization. Other vendors hand you a slide about their accuracy. Here the software grades itself on your machines, and the report is yours.

WEEK 1Scope fixed, baselines learned: what normal looks like for each machine, program and operator. Before a baseline exists, it forecasts nothing.
WEEKS 2–4Forecasts published before the hour, resolved after it, and graded validated, invalidated or unresolved. Misses are as visible as hits; that is the point.
DAY 30The validation report: forecast accuracy against the chance comparison and the false-alarm rate, measured on your machines, not projected from ours. You own it.
WHAT FOLLOWSPromotion from observe to recommend takes your written authorization, reviewed against the report. Anything granted can be revoked, and everything stays on the record.
QUESTIONS WE GETSHORT ANSWERS · THE PAGE THAT BACKS EACH ONE

The questions a shop asks first. Answered plainly.

What is Production Pulse?

Shop-floor operations software for precision manufacturers, built by a manufacturer: secure program control and scheduling, live monitoring of every machine and operator, and secure AI governance, on one on-premises server with one Pulse Point device per machine, with Inspection Pulse (inspection records tied to the part and the program) next on the roadmap. One platform, one bill, in place of the three or four point tools a shop typically runs. The platform →

Is there a demo I can watch?

Yes. Four short videos recorded on a working floor: a 75-second platform overview, Program Pulse and Shop Pulse showcases, and a Pulse IQ and Pulse Pilot showcase. They play here on this site; nothing loads from a video host. Watch the videos →

Does production data leave the shop?

No. Production Pulse runs on an ordinary Windows or Linux server inside your network; no special appliance and no cloud. Programs, machine data and production records stay on your premises, Pulse Point devices talk only to that server, and Pulse IQ needs no outbound connection and no outside model. Closed loop, not open cloud. How deployment works →

What is the 30-day Proving Period?

The first month of every installation, for Pulse IQ. The modules you deploy work from day one; Pulse IQ spends its first 30 days in observe mode. Scope, software version, baseline and evaluation criteria are fixed before it starts, every forecast is published before the period it covers and graded when the period closes, and at day 30 you receive a validation report you own. Only that graded record, reviewed with you, supports promotion from observe to recommend, and any step beyond observe takes your written authorization. The Proving Period →

How is Production Pulse sold?

Through sales and marketing partners that already serve the shop, and directly where a partner is not in place, so there is no public price list. Start with a demo from our team: an hour on your parts, your machines, and your priorities, and a straight assessment either way. Book a demo → Want to sell it? Partners →

How big a shop is it built for?

Shops and plants with 20 or more CNC machines, expanding in blocks of five; pilots of ten machines are quoted case by case. It also runs the captive machining department inside a larger manufacturer, which is where it was built, and extends from CNC to PLC-driven equipment across the plant. Who it is for →

Which machines, controls and ERP does it connect to?

Fanuc controls are supported as standard, with 40+ machines live on the proving floor; other controls are quoted at the site survey. Any control with an Ethernet or RS-232 connection does DNC, and the G-code editor understands Fanuc, Haas, Siemens and LinuxCNC dialects. It integrates with any ERP, read-only for jobs, routings and standards, with Infor VISUAL in production today, and a wizard migrates a Predator DNC library with its history. What it works with →

Does it make us CMMC compliant?

It supports the access-control, configuration-management and audit-evidence practices your self-assessment attests to, and keeps them true daily rather than the week before you post a score: programs in a vault instead of on jump drives, attributable approvals, and a transfer log. It is engineered to support CMMC, AS9100 and ITAR practices; it does not confer certification by itself. The pause and the standard →

What does support look like?

Support is part of the subscription, not an upsell: same business day, from the team that builds the platform and runs it on a working floor. Call 440-266-7700 or email support@productionpulse.com. Support →

Next action

See what precision manufacturing looks like on the record

A demo takes an hour. We will walk your parts, your machines, and your priorities through the platform, Pulse IQ and Pilot included, and leave you with a straight assessment either way.

Book a demo →
GO-LIVE 2026 · SELF-ASSESSMENTS DUE EVERY YEAR · NIST SP 800-171 UNCHANGED

Every claim on this page is a structural fact of the platform; nothing here is a forecast. The journal rows and the hero telemetry panel are simulated feeds with illustrative values; your deployment grades its own, and the validation report you receive is the only number that applies to your floor.